Chapter 78: Dimensional Reduction Attack
Chapter 78: Dimensional Reduction Attack
It's not a lockdown period now, and everyone has things to do, so many viewers left after satisfying their curiosity.
Most of those who didn't leave were either still in the live stream room doing other things.
The very few remaining "supervisors" who patiently and meticulously observed the work were either industry professionals or people with ulterior motives.
Therefore, after a while, some people started frantically posting comments: "The White Tiger District has already compacted the ground and started laying the track foundation!?"
"Isn't this construction speed a bit too fast?!"
"This is absolutely outrageous! Are they trying to kill us?"
So, from now on, civil engineering companies without engineering mechs won't deserve to remain in the civil engineering industry, right?!
"This is going to bankrupt small civil engineering companies!"
"It's just pressing down on the ground, right? The details don't need to be so exaggerated."
"Yeah, what's the big deal? We just got internet access!"
"You guys don't know anything!"
"A three- to five-millimeter error on a normal road surface is no big deal, but the road surface error in the White Tiger Zone must be locked within 0.8 millimeters. Otherwise, serious accidents such as track cracking and load deviation will definitely occur during high-speed catapult launches later on!"
As soon as this person's comment appeared, another related person's comment also appeared: "The road surface in the White Tiger District cannot be simply compacted."
It is necessary to repeatedly compact the soil in multiple layers, perform laser leveling over the entire area, and dynamically correct settlement to ensure that the density of every inch of the foundation is uniform!
Otherwise, a serious accident will definitely occur in the future.
"There's no need to make such a fuss, is there?"
"To put it this way, let alone an area as large as the White Tiger District, even just one percent of that area would require a whole team of people and top-of-the-line equipment to polish the road surface for a full half month in order to reduce the error to within 0.8 millimeters."
Moreover, for those two weeks, they had to serve the road surface every day like eunuchs serving the emperor, fearing that a single mistake would require rework, or even worse, that they would lose their heads.
"But look at the situation in the White Tiger District. In just a few hours, they've compacted such a large area of road... This efficiency... No, I need to get the people below to acquire a few more mechs quickly, or we might not be able to get any!"
"Damn it, I need to get people to get their hands on these as soon as possible!"
"Is this a live stream of construction work or a live stream of product sales?"
"Instead of wasting time talking nonsense, you might as well do a few mecha problems... There will only be a shortage of engineering pilots, not an increase, especially those who can perform special engineering pilots."
"..."
Just as the audience's comments were flying everywhere, the White Tiger Engineering Mech Cluster had already completed the base installation and was beginning to lay the underlying electromagnetic conductive modules.
The heavy E-carbon steel blocks were held firmly in the hands of the engineering mecha, then precisely positioned, with the buckles automatically engaging and the hidden fastening structure locking instantly. The whole process was as smooth as silk, and the modules fit together so perfectly that not a single gap could be seen, which was enough to make obsessive-compulsive people feel like they were in heaven.
The layman looks at the excitement and the insider looks at the doorway.
Compared to the enjoyment of ordinary viewers, those in the industry were truly amazed.
Because, while the White Tiger engineering mech is working at high speed, it can actually perform dynamic calibration at the millisecond level.
Otherwise, the modules cannot be merged smoothly.
Because special ejection magnetic modules are all interference-fit snap-fit structures, even a deviation of 0.1 mm will prevent them from engaging properly.
If you force it in, it will definitely become stuck and deformed.
The so-called interference snap-fit structure refers to a high-precision mechanical interlocking structure that is screwless, weldless, zero-gap, and self-locking. It is the mainstream connection method for military, aerospace, and electromagnetic rail equipment.
Compared to ordinary clips, the parts of an interference fit clip are slightly larger than the latch by less than 1 millimeter, or even just a few micrometers.
During assembly, it must be precisely squeezed by machinery and forcibly embedded through elastic deformation.
After assembly, the parts will spring back and expand, firmly filling the entire bayonet, with zero gaps, zero play, and no looseness throughout the process.
If it comes to this, the entire facility will be like a single piece, seamless, vibration-resistant, and non-deformable.
Even with long-term, high-frequency, and high-intensity use, the modules will not become loose.
Just then, the live stream suddenly switched to the Azure Dragon area.
Then, the audience discovered that the Azure Dragon area had also reached a stage of completion: the foundation pit that was originally going to sink deep into the ground had actually been dug out, and the Azure Dragon engineering mech cluster was orderly leaving the bottom of the pit, revealing a regular, vertical, giant deep pit without any collapse, collapse, or unevenness.
"No way, such a huge and deep foundation was dug out in just half a day!?"
"Damn it, not only did they dig it up, but they also cleaned up all the dirt they dug out! That's going too far!"
"With this kind of efficiency, if it were prefabricated housing, a building could probably be erected in a single day!"
"This is terrifying!"
"Look at the bottom of the pit! The layered reinforcement patterns are clearly visible. The engineering mechs were dug deep, compacted, and stabilized layer by layer!"
This process is definitely not shoddy work!
"Holy crap, who would dare to shoddy this project?"
"I suggest a thorough investigation of the person upstairs; they actually thought of shoddy construction projects—they must have done it in real life!"
"..."
As viewers commented on the screen, the camera switched to three other areas: the Vermilion Bird area remained meticulous, calibrating the superconducting circuit layout bit by bit; the Black Tortoise area steadily built up protective barriers; and the Qilin area took the lead in overall coordination, constantly calibrating the parameters of the entire domain's linkage.
After viewing all the areas one by one, the view switched back to a bird's-eye view.
Subsequently, the data summary appeared on the screen: the pass rate of ground hardening in the White Tiger Battle Zone was 100%, and the error of track base splicing was controlled within 0.8 mm;
The ultra-deep foundation pit in the Qinglong war zone has been reshaped, and the ground settlement value has stabilized at the safe threshold.
The pre-embedded superconducting circuit in the Zhuque Theater has achieved zero offset and meets the magnetic field shielding standards.
The protective modules of the Xuanwu Battle Zone fit tightly, and the curvature of the irregularly shaped guide channels is accurate.
The adaptation of the central interface for the Qilin Battle Zone's full-domain linkage is progressing steadily, and cross-regional collaboration parameters are being continuously calibrated.
At the very bottom of the data, a red countdown timer that kept updating rapidly in milliseconds made the viewers in the live stream widen their eyes.
"Wait, is this countdown a countdown to completion?!"
「27天17小时32分钟42秒,41秒……艹,28天的时间建一座发射矩阵,这疯了吧!?」
"Normally speaking, if it were built entirely by hand, it would take a full eight to ten years to barely take shape!"
Look closely, it's barely formed!
Even with top-of-the-line construction machinery and a team of 10,000 people working in three shifts, it would still take at least three to four years to get it off the ground.
This doesn't even include the time spent on later electromagnetic debugging and structural re-inspection!
"And now, the entire launch matrix can be completed in just 28 days... Civil engineering companies without engineering mechs might as well switch careers now!"
"Ten years for humans, three years for machines, twenty-eight days for mechs... This isn't just speeding up, it's a complete technological leap!"
"The civil engineering industry has completely changed!"
DipNovel